11/06/2012 Visimind has completed the delivery of 1041 km of medium voltage power line inspection for ERDF in a pilot project frame. This project conducted in the area of the city of Valence allowed Visimind to implement its last technologies in the domains of High Definition images capture,...
From 2009 Visimind Polish division is involved in the project for the Italian distributor of energy, Davis Company. The project includes documentation of all voltage power lines with a total length of more than 60,000 km. Estimated project completion date is 2011.
In the month of April 2009, the company Visimind carried out a project for the General Directorate for National Roads and Highways, a division of Poznan. The project was to illustrate the lane from the car and helicopter, and laser scanning (laser density 4pkt/m2) and create...
In 2009, Visimind performed together with a company of over 3000 km ELTEL inspection of power lines across the Polish for PSE Operator SA The project involved the provision of data to inventory and measurement of high voltage power lines, digital GIS land ownership records in the belts of...
In 2009, the company Energa, branches in Gdansk and Olsztyn have made an inspection of power lines 110kV and 15kV with a total length of almost 1500km. The project involved, and to provide orthophotomaps for land along the lane line to 110 kV.
In 2009, the company performed an inspection Visimind HV overhead lines and stations HV / MV from the helicopter in action EnergiaPro SA branch in Opole. The project consisted of, inter alia, the inspection camera Crown.
Visimind AB | Södra långgatan 23, 169 59 Solna, SWEDEN | Phone +46 (0) 8 594 955 49